Pelatihan di Bandung
By September 18, 2014 0 Comments Read More →

DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS

DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS

Bandung | 13 – 14 October 2014 | Rp 3.950.000
Bandung | 24 – 25 November 2014 | Rp 3.950.000

 

 

INTRODUCTION:

Permit to work are used to control high risk work activities, such as hot work, work at height, confined spaces work etc. Method statements are used in many industries, again as a control measure to detail the correct and safe sequence for work operation.



OBJE
CTIVES:

The purpose of this training  is to help in determining if a job requires a work permit due to ESS&H hazards, system complexities, or work coordination needs.  If the job already has an established work procedure or has been reviewed and defined as “Worker Planned” work due to the training and qualifications of the crafts person or technician, then the checklist is not needed.



WHO
SHOULD ATTEND THIS TRAINING?:

Anyone who uses or issues permits to work and anyone who produces or used method statements.

 

OUTLINE DEVELOPING PERMIT TO WORK SYSTEMS AND METHOD STATEMENTS:

  1. Overview of safe systems of work
    1. Human Engineering
    2. Machine and Tools guarding
    3.  Behavioral factors
  2. The purpose of permits and method statements
    1. ESS&H or Other Permits Needed
    2. Safety, Security and Facility Concerns
    3. Environmental/Waste Concerns
    4. Radiation Issues
    5. Complexity/Uncertainty Issues
    6. Work Coordination
  3. Permit to work systems
  4. Use of the documents in practice
  5. Document templates will be provided to all delegates during the course.

 



Instruktur Training

Bambang Pamudji BSc.SE

Bambang Pamudji, B.Sc.,SE. has much real experiences, he is former Senior Health and Safety staff at PT. Pupuk Sriwidjaja,PUSRI(Urea Fertilizer Manufacturer) Palembang. He was born in Pasuruan East Java, 14 March 1950. He got his B.Sc in Public Health from APK Surabaya in 1971 and was graduated from Economic Management Sriwidjaja University, UNSRI, Palembang in 1996. He has certificates in Health, Safety, and Environment (HSE) from Depnakertrans RI/Institutions and Universities in Indonesia, institutions and Universities in UK, and National Safety Council. Experienced in setting up Health and Safety Management System documentation and its application. Experienced internal lead auditor SMK3 in PT. Pupuk Sriwidjaja, and External lead auditor SMK3 for Indonesian Association Fertilizer Producer. He has been teaching industrial training classes for many classes related to topics of his competencies, HSE. Many participants from many companies in Indonesia have participated in his training classes.



VENUE :  

Hotel Kagum Group Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)

 

TRAINING DURATION : 

2 days


 

TRAINING TIME 2014:  

  1. 13 – 14 October 2014
  2. 24 – 25 November 2014

 

INVESTATION PRICE/PERSON :

  1. Rp 3.950.000/peserta (bayar penuh)  atau
  2. Rp 3.750.000/peserta (early bird, yang membayar 1 minggu sebelum training) atau
  3. Rp 3.500.000/peserta (grup, untuk 3 peserta atau lebih dari 1 perusahaan yang sama)

 

FACILITIES FOR PARTICIPANTS :

  1. Training Module
  2. Flashdisk contain training material
  3. Certificate
  4. NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Foto
  8. Training room with full ac facilities and multimedia
  9. Lunch and twice coffee break everyday of training
  10. Qualified Instructor
  11.  Transportation from hotel of participants to hotel of training VV (if minimal participants from the same company is 4 )

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

Post a Comment